kop

Ervaren allround HTS ingenieur Energietechniek, opwekking , distributie, wind energy.

Korte omschrijving: 
Wil zich voorgoed vestigen en kennis/ kunde aanwenden voor de verdere ontwikkeling van Bonaire.

My name is Frank Robert Lefeber,

At present I work as Business development manager in the Middle East.

 

My career started with Shell in Manufacturing. (Refineries) During my career I have been involved in all disciplines of the oil and gas industry. I have worked 7 years in the desert of Oman in Construction, maintenance, engineering and Utilities. In Brunei as Construction manager Onshore. I was the engineering manager for a large electricity provider in the Netherlands and Site manager for the construction of a power station, driven by gas turbines and equipped with waste heat recovery units and steam turbines. Worked as Turn Around manager on a coal fired Power plant and  I was the general manager for a company, involved in the repair of industrial electric motors, transformers and generators.

In Saudi Arabia, I was the general manager for a company involved in the provision of industrial services, construction and maintenance for the oil, gas and chemical industry. During my career, I have been involved in making business plans, marketing plans and quotations to clients, including long-term service contracts.

Back to Shell as Maintenance and Integrity Manager on the Island of Sakhalin Russian Federation.

Worked as Turn Around Manager on the Nynashamn Refinery in Sweden.

 

 

If you require further information, please do not hesitate to contact me on my private E-mail, F.R.Lefeber@chello.nl

 

Regards

 

Frank R. Lefeber

 

Branche: 
Energie
Functiegroep: 
Techniek
Werk / Denkniveau: 
HBO
Talenkennis: 
Engels
Nederlands
Overige
Full- of parttime: 
Fulltime
Werkervaring: 
- Electrical engineering - Rotating equipment - Multi discipline project leading - Power generation including wind energy - Transmission and HV Distribution - HV switching up to 132 KV - GFT installations and Biogas usage - Reverse osmose installations and seawater desalters - Construction
Datum van beschikbaarheid: 
20 oktober 2011